Sonoma County Adult Detention Facility Inmate Connector

Santa Rosa, CA

Scope: Form/Strip Roof of Underground Tunnel and Stair and Elevator Shaft

The Inmate Connector project is used to transfer inmates from the existing adjacent jail through the underground tunnel to the courthouse (currently under construction). The Stair and Elevator Shafts were formed with 50 foot tall wall forms and also included exposed architectural reveal and tie pattern. The tall wall forms required extensive engineering to account for wind load bracing of the tall wall forms.

Project Gallery

8164 ALPINE AVE
SACRAMENTO, CA 95826

Office: (916) 370-6018
Fax: (916) 800-1005
CA Lic#957307|NV Lic #84720|SBE #1738206

PARTNER
OPERATIONS

Chris Worth
(916) 698-8558
cworth@capconinc.net

LEADERSHIP TEAM

PARTNER
ESTIMATING

Tom McDonagh, PE
(916) 761-7974
tmcdonagh@capconinc.net


ENGINEERING
Jorge Galan, PE
(916) 730-0232
jgalan@capconinc.net


SAFETY | FIELD OPERATIONS
Corey Stephen
(916) 417-9401
cstephen@capconinc.net

  • LinkedIn

©2024 by CAPCON.

bottom of page