top of page

233 East Grand Parking Structure

South San Francsico, CA

Scope: Form/Strip All Slabs, Beams, Walls, Columns, and Elevator Core Wall

The 233 East Grand Parking Structure is a 3 level parking structure for the Nexus building. The structure has an elevator Core with architectural board form finish which was formed with 50 foot tall wall panels and poured in 2 lifts. The Stairs were keyed into the formed surface, allowing for the stairs to be poured thereafter. Following the formation of the core wall, the garage was then built and completed.

Project Gallery

8164 ALPINE AVE
SACRAMENTO, CA 95826

Office: (916) 372-6018
Fax: (916) 800-1005
CA Lic#957307|NV Lic #84720|SBE #1738206

PARTNER
OPERATIONS

Chris Worth
(916) 698-8558
cworth@capconinc.net

LEADERSHIP TEAM

PARTNER
ESTIMATING

Tom McDonagh, PE
(916) 761-7974
tmcdonagh@capconinc.net


ENGINEERING
Jorge Galan, PE
(916) 730-0232
jgalan@capconinc.net


SAFETY | FIELD OPERATIONS
Corey Stephen
(916) 417-9401
cstephen@capconinc.net

  • LinkedIn

©2024 by CAPCON.

bottom of page